Actions

7TQA

From SpinozaWiki

Revision as of 16:00, 22 February 2023 by Thijssen (talk | contribs)

7T QA procedure

The QA procedure contains several steps. Make sure there is no patch activated while doing them.

1) MR signal stability and RF transmit test

2) EPI stability

3) SPT batches


MR signal stability and RF transmit test