Actions

7TQA

From SpinozaWiki

Revision as of 16:42, 22 February 2023 by Thijssen (talk | contribs)

7T QA procedure

The QA procedure contains several steps. Make sure there is no patch activated while doing them.

1) MR signal stability and RF transmit test

2) EPI stability

3) SPT batches


MR signal stability and RF transmit test

The goal of the test is to show stable performance using the Dual 1H TR interface box with the Nova volume TR coil and the receive interface boxes with the Nova 32 channel array insert. Or in case of MTX8 the Nova TX8 Rx32 coil. If the results are stable the system can be used for sensitive scanning like fMRI.

Duration:

Classic: 12 minutes including 1-time repositioning (excluding building setup)

MTX8: 25 minutes including 1-time repositioning (excluding building setup)

How to run:

Before starting make sure that:

  • The system is fully calibrated
  • No patch is loaded
  • Application software isn't running
Output:
What if it indicates problems: