7TQA: Difference between revisions
From SpinozaWiki
No edit summary |
|||
Line 57: | Line 57: | ||
;'''What if it indicates problems:''' | ;'''What if it indicates problems:''' | ||
Report to Philips. |
Revision as of 11:36, 23 February 2023
7T QA procedure
The QA procedure contains several steps. Make sure there is no patch activated while doing them.
1) MR signal stability and RF transmit test
2) EPI stability
3) SPT batches
MR signal stability and RF transmit test
The goal of the test is to show stable performance using the Dual 1H TR interface box with the Nova volume TR coil and the receive interface boxes with the Nova 32 channel array insert. Or in case of MTX8 the Nova TX8 Rx32 coil. If the results are stable the system can be used for sensitive scanning like fMRI.
- Duration:
Classic: 12 minutes including 1-time repositioning (excluding building setup)
MTX8: 25 minutes including 1-time repositioning (excluding building setup)
- How to run:
Before starting make sure that:
- The system is fully calibrated
- No patch is loaded
- Application software isn't running
Classic:
Build the setup using the next coils and interface boxes. Use the wooden phantom holder with the blue 10cm sphere to position the phantom. Move the setup to iso center.
MTX8:
Build the setup using the Nova TX8RX32 coil. Use the wooden phantom holder with the blue 10 cm sphere to position the phantom. Move the setup to iso center.
All batches mentioned here are located in g:\Toolbox_TestPlatform. Execution starts by checking if the setup is in the iso center. Run the following batch to check the phantom position:
- Classic: start_01_mtx2_check phantom_position.bat
- MTX8: start_11_mtx8_check phantom_position.bat
If the setup is within 1 cm of the iso center, it's sufficient to proceed with the stability and transmit test. Execution of the stability test and transmit test is done by running the following batches:
- Classic: start_02_mtx2_MR_signal_stability_quick.bat & start_03_mtx2_transmit_signal.bat
- MTX8: start_12_mtx2_MR_signal_stability_quick.bat & start_13_mtx2_transmit_signal.bat
Possible issues: patch not removed. Remove patch and do a start_stop_procs.pl stop & start
- Output:
Analysis is done visually by comparing the results with the default sets.
- The expected results for classic are depicted .......
- The expected results for MTX8 are depicted .......
For the MR signal stability test compare the tabs in the test viewer (ScopeViewer) with the appendixes mentioned.
- What if it indicates problems:
Report to Philips.