Actions

7TQA: Difference between revisions

From SpinozaWiki

Blanked the page
Tag: Blanking
No edit summary
Line 1: Line 1:
==7T QA procedure==
The QA procedure contains several steps. Make sure there is no patch activated while doing them.


1) MR signal stability and RF transmit test
2) EPI stability
3) SPT batches
==MR signal stability and RF transmit test==

Revision as of 16:00, 22 February 2023

7T QA procedure

The QA procedure contains several steps. Make sure there is no patch activated while doing them.

1) MR signal stability and RF transmit test

2) EPI stability

3) SPT batches


MR signal stability and RF transmit test